|
CBL INSTALLATION LIST FOR LOW NOx BURNERS IN INDIA |
|
CBL
JOB NO. EILJOBNO.
|
INSTALLATION
|
TYPE OF EQUIPMENT
|
NO.OF UNIT
|
FUEL
|
GUARANTEED/
ACTUAL NOx |
NO. OF BURNER (BOILER)
|
COEN METHOD OF NOx REDUCTION
|
BURNER CAP. MKCAL/HR BURNER
|
YEAR SUPPLIED/ OPERATION
|
COMMENT
|
|
CBL-94372
|
BPCL REFINERY
|
63 TPH ABB BOILER
|
3
|
SHORT RESIDUE/LSHS/ REFINERY GAS
|
250 PPM
|
FOUR(3)
|
DAZ WITH NOx PORTS | 30.1 | 1996 2 Units 1 Unit-2000 | Low NOx Techniques/air staging used with DAZ Bunrer |
|
CBL-96459 EIL-3244
|
NUMALIGARH REFINERY
|
72 TPH TBW BOILER
|
1
|
NAPTHA/ IFO/NG
|
50 PPM
|
FOUR (1)
|
CPF-LN
|
12.10 | 1996 Comm. | Multifuel Burner NOx guaranteed on NG/Naphtha. Used FGR as NOx Reduction Technique. |
|
CBL-88123 EIL-2567
|
GAIL- VIJAYPUR
|
VC HEATER
|
2
|
FUEL GAS
|
60 PPM
|
FOUR (1)
|
CLN
|
1.6 | 1988 | Natural Draft Burner for Regeneration |
|
CBL-89144 EIL-2567
|
GAIL VIJAYPUR
|
VC HEATER
|
2
|
FUEL GAS
|
60 PPM
|
FOUR (1)
|
CLN
|
1.6 | 1989 | Natural Gas heating (excess air 10%). |
|
CBL-96456 EIL-3236
|
IOCL- PANIPAT
|
AIR HEATER
|
2
|
FUEL GAS
|
100 PPM
|
ONE (1)
|
CPF-LN
|
5.2 - 1No. 2.3 - 1 No. | 1997 | Process air heater supplied with CPF-LN burner for process air heating at design pressure of 5.0 kg/cm2 |
|
CBL-99690
|
HPCL - VIZAG thru' BHPV |
CO-BOILER
|
1
|
Heavy Oil Refinery Gas
|
300 PPM(Oil) 150 PPM(Gas) |
3 for Auxiliary furnace 1 for CO furnace
|
DAZ with NOx ports
|
10.5 -3 Nos. 4.2 - 1 No. | 2000 | Low NOx Techniques/air staging used with DAZ Bunrer |
|
CBL-99696
|
HPCL- Mumbai thru' BHPV |
50 TPH Boiler
|
1
|
Heavy Oil Refinery Gas
|
300 PPM(OIL) 170 PPM(GAS) |
One 1
|
DAF
|
45.5 | 2000 | Fuel & Air Staging |
|
CBL-00807
|
ONGC HAZIRA thru' TBW |
37.4 TPH Boiler
|
1
|
Natural Gas
|
50 PPM |
ONE 1
|
DAF
|
26.35 | 2000 | Fuel & Air staging |
|
CBL-00828
|
ETA-DUBAI thru' TBW |
38 TPH Boiler
|
1
|
Diesel Oil/ Natural Gas
|
73 PPM (OIL) 49 PPM (GAS) |
TWO 2
|
DAF
|
13.6 on Oil 14.1 on Gas | 2000 | Flue gas recirculation |